
Great Hollands Primary School Case Study – School Canopy Installation
Products: 3 No. Spaceshade Max School canopies System
Sector: Education
Location: Bracknell
Specifier: The Bush Consultancy
Kensington worked with The Bush Consultancy to come up with 3 No. Covered areas on a new primary school facility built in conjunction with Beard Construction, one of which was a wall mounted example using the integrated wall plate fixed directly to the wall, the other two were mounted to our robust GDX goalpost component which allows this School Canopy system to be mounted independently of adjacent surfaces which cannot be fixed to using the wall plate. This was an excellent example of this where the existing walls were not considered to be sound enough to withstand the structural wind loading requirements.