+44 (0)117 958 9933 sales@kensingtonsystems.co.uk
Edinburgh Control Tower case study

Edinburgh Control Tower case study

Product: Motorized vertical blinds
Sector: Public Sector
Location: Edinburgh

Kensington was called to supply motorized vertical blinds to the control rooms, this was very technically demanding due to the rake and curve of such an Iconic building situated at Edinburgh airport.

The blinds had to quickly and easily controlled with minimum operator effort to reduce any distraction to the flight controllers.

All operated via Hand held remote control for ease of operator effort in the demanding environment of a control tower.

Project gallery (select images to see more detail)

Can we help?
Request a call back by filling in your details below or call us on +44 (0)117 958 9933.
No Thanks
Thanks for signing up. You must confirm your email address before we can send you. Please check your email and follow the instructions.
We respect your privacy. Your information is safe and will never be shared.
Ribbon
This is a special one time offer!
×
×

Pin It on Pinterest